Cathedral Street Reopens in Mount Vernon

Green banner with DPW logo and text "Department of Public Works Press Release"

Cathedral Street, between Madison and Monument Streets in Baltimore City’s Mount Vernon neighborhood, has been reopened to traffic following a closure of more than six months for emergency sewer repair work.

The reopening, on Friday morning, May 5, comes just in time for Baltimore’s iconic Flower Mart event.

The block was closed in October when a cavity opened in Cathedral Street near the intersection of Monument Street. The cause was a hole in a major sewer main more than 30 feet beneath the surface that allowed earth to seep into the sewer. The result was an hourglass effect that created a void under the street until it, too, collapsed.

It was the third time in 2016 that a hole opened on that section of sewer main. In late April a collapse occurred in the 100 block of West Centre Street, and on July 4 another void closed the 400 block of West Mulberry Street.

The Baltimore City Department of Public Works (DPW) has installed a newly lined pipe that runs for about 1.2 miles, from the west side of downtown to the north side. The technology used creates a new, stronger pipe inside the old, brick-and-mortar sewer. The entire project cost more than $20 million, and is designed to provide stable sewer service long into the future.

Other utilities, including water and gas, were also rebuilt in the areas of the street collapses.

DPW is refurbishing, or rebuilding, many miles of water and sewer mains each year in order to strengthen systems that are, in many places, more than 100 years old. The result will be more reliable water delivery and sewer collection systems that protect public health and the environment.

Related Stories

DPW is Now Accepting Public Comments on the Modified Sanitary Sewer Consent Decree Revised Emergency Response Plan 

The Baltimore City Department of Public Works (DPW)  has announced the release of its Revised Emergency Response Plan (ERP), a reference tool to be used by City personnel during a sanitary sewer overflow or reported building backup emergency. The Modified Sanitary Sewer Consent Decree (MCD) requires DPW to submit a revised Emergency Response Plan to protect the public health and welfare in the event of an unpermitted release, spill, or discharge of pollutants from the sewer collection system or in the event of a reported building backup.

Register Now for the Mayor's Fall Cleanup, October 26

Mayor Brandon M. Scott, the Baltimore City Department of Public Works (DPW), and the Mayor's Office of Community Affairs have announced the upcoming Mayor's Annual Fall Clean-up and Day of Service. Residents, volunteer groups, and community associations are encouraged to register now to participate in the city-wide effort to beautify neighborhoods. The event will run on Saturday, October 26, 2024, from 9 a.m. to 1:00 p.m.

Mattress and Box Spring Recycling Now Available at Quarantine Road Landfill Residential Drop-Off Center



Looking to get rid of an old mattress? Baltimore City residents can now drop off mattresses and box springs for recycling at the Baltimore City Department of Public Works’ (DPW) Quarantine Road Landfill Residential Drop-Off Center. In the coming months, DPW will expand this mattress recycling service to other Residential Drop-Off Centers across the city.