Heavy Weekend Rains Contribute to Sewer Overflows

Green banner with DPW logo and text "Department of Public Works Press Release"

Weekend rains contributed to sewer overflows of about 21 million gallons of stormwater mixed with sewer water.

Most of the overflow – 13.5 million gallons – spilled into the Jones Falls through structured overflow points located underground. These structured overflows were designed more than 100 years ago to relieve pressure when stormwater infiltration exceeds the sewer pipes’ capacity, and will be removed as part of the ongoing work of Baltimore City’s sanitary sewer consent decree.

About 6.5 million gallons reached the Gwynns Falls beginning Sunday, May 12, and ending early Tuesday, May 14, when a sewer main overflowed at Wilkens Avenue and Brunswick Street. Other overflows at 3900 Belair Road sent an estimated 867,000 gallons of stormwater/sewer water into Herring Run, and two overflows in East Baltimore (1800 block of E. Eager St. and 1700 block of E. Chase St.) drained a combined 32,000 gallons directly into the Inner Harbor.

The public is advised to avoid direct contact with the receiving waters impacted by these or any other overflow.  Waterways throughout Baltimore City are considered impaired, and may not meet applicable standards for full-body contact recreation, including swimming, regardless of the impact of a specific sewer overflow.  Accordingly, the City discourages full-body contact with all surface waters.

For additional information regarding potential health impacts, please visit: https://health.baltimorecity.gov/sanitary-sewer-overflows-sso or call 410-396-4428.

For additional information pertaining to a specific overflow, please call the Baltimore City Department of Public Works at 410-545-6541.

Due to the ongoing network outage, our interactive maps are temporarily out of service.

 

Related Stories

DPW is Now Accepting Public Comments on the Modified Sanitary Sewer Consent Decree Revised Emergency Response Plan 

The Baltimore City Department of Public Works (DPW)  has announced the release of its Revised Emergency Response Plan (ERP), a reference tool to be used by City personnel during a sanitary sewer overflow or reported building backup emergency. The Modified Sanitary Sewer Consent Decree (MCD) requires DPW to submit a revised Emergency Response Plan to protect the public health and welfare in the event of an unpermitted release, spill, or discharge of pollutants from the sewer collection system or in the event of a reported building backup.

Register Now for the Mayor's Fall Cleanup, October 26

Mayor Brandon M. Scott, the Baltimore City Department of Public Works (DPW), and the Mayor's Office of Community Affairs have announced the upcoming Mayor's Annual Fall Clean-up and Day of Service. Residents, volunteer groups, and community associations are encouraged to register now to participate in the city-wide effort to beautify neighborhoods. The event will run on Saturday, October 26, 2024, from 9 a.m. to 1:00 p.m.

Mattress and Box Spring Recycling Now Available at Quarantine Road Landfill Residential Drop-Off Center



Looking to get rid of an old mattress? Baltimore City residents can now drop off mattresses and box springs for recycling at the Baltimore City Department of Public Works’ (DPW) Quarantine Road Landfill Residential Drop-Off Center. In the coming months, DPW will expand this mattress recycling service to other Residential Drop-Off Centers across the city.